About

Cost
$ $ $ $ $
Difficulty
• • • • •
Time
18h00

Cadhla Shawl
I’m happy for being able to design a feminine shawl with a worsted weight yarn!
Because is worked with a thicker yarn, Cadhla shawl is a fast knit project, perfect for Xmas gifts! You will need about 260yds of worsted weight yarn.
Cadhla is worked bottom-up starting with the lace border. The half moon shape is worked with short rows at the Stockinette stitch section.
You can work with any worsted yarn. However, I would like to suggest single-ply yarns because they enhance the stitch motif.

Posted by Paula PKL from São Paulo, State of São Paulo, Brazil • Published See Paula PKL's 7 projects »
Downloads
  • 111622_2F2015-10-20-233644-Cadhla+Shawl.pdf 184 KB [ Download ]
PrintEmbed
  • Step 1

    Directions
    With US 10 / 6mm needles and Long Tail Cast on Method,
    loosely CO 228 sts. Set up row: K 20, pm, (K19, pm) 10 times, K
    18. Change for smaller needles (US 8 / 5mm) and work rows 1 to
    17 from the chart. Key
    Chart
    Chart written instructions
    Row 1: slip 1 st, cdd, P1, K5, K2tog, YO, K1, YO, SSK, K3, [T2R,
    K3, K2tog twice, (YO, K1) 3 times, YO, SSK twice, K3] 10 times,
    T2R, K3, K2tog, YO, K1, YO, SSK, K5, P1, cdd, K1.
    Row 2: slip 1 sts, P to end, slipping markers.
    Row 3: slip 1 st, cdd, P1, K2, K2tog, YO, P3, YO, SSK, K2, [T2R,
    K2, K2tog twice, YO, K1, YO, P3, YO, K1, YO, SSK twice, K2],
    T2R, K2, K2tog, YO, P3, YO, SSK, K2, P1, cdd, K1.
    Row 4: slip 1 st, P6, K3, P6, [P7, K3, P9] 10 times, P4, K3, P7.
    Row 5: sl 1 st, cdd, P1, K2, P1, MB, P2, YO, SSK, K1, [T2R, K1,
    K2tog twice, YO, K1, YO, P2, MB, P2, YO, K1, YO, SSk twice,
    K1] 10 times, T2R, K1, K2tog, YO, P2, MB, P1, K2, P1, cdd, K1.
    Row 6: sl 1 st, P4, K4, P5, [P6, K5, P8] 10 times, P3, K4, P5.
    Row 7: sl 1 st, cdd, P1, K2, MB, P2, YO, SSK, [T2R, K2tog
    twice, YO, K1, YO, P2, MB, P1, MB, P2, YO, K1, YO, SSK twice]
    10 times, T2R, K2tog, YO, P2, MB, K2, P1, cdd, K1.
    Row 8: sl 1 st, P4, K3, P4, [P5, K7, P7] 10 times, P2, K3, P5.
    Row 9: sl 1 st, cdd, P1, K1, YO, SSK, K2, [T2R, K3, K2tog twice,
    (YO, K1) 3 times, YO, SSK twice, K3] 10 times, T2R, K2, K2tog,
    YO, K1, P1, cdd, K1.
    Row 10: sl 1 st, P to end, slipping markers.
    Row 11: sl 1 st, cdd, P1, K1, YO, SSK, [T2R, K2, K2tog twice,
    YO, K1, YO, P3, YO, K1, YO, SSK twice, K2] 10 times, T2R,
    K2tog, YO, K1, P1, cdd, K1.
    Row 12: sl 1 st, P7, [P7, K3, P9] 10 times, P6.
    Row 13: sl 1 st, cdd, P1, K1, [T2R, K1, K2tog twice, YO, K1, YO,
    P2, MB, P2, YO, K1, YO, SSk twice, K1] 10 times, T2R, K1, P1,
    cdd, K1.
    Row 14: sl 1 st, P5, [P6, K5, P8] 10 times, P4.
    Row 15: sl 1 st, cdd, [T2R, K2tog twice, YO, K1, YO, P2, MB,
    P1, MB, P2, YO, K1, YO, SSK twice] 10 times, T2R, cdd, K1.
    Row 16: sl 1 st, P3, [P5, K7, P7] 10 times, P2. Row 17: SSK, P
    slipping markers, until las 2 sts, K2tog. Next row: P all sts
    removing markers. You will have 194 sts on the needle.
    Shaping with Short Rows
    Row 1: sl 1 st, K 103, turn the work. Row 2: P 14, turn the
    work. Row 3: K until 1 st before turning point, SSK, K2, turn the
    work. Row 4: P until 1 st before turning point, P2tog, P2, turn the
    work. Repeat rows 3 and 4 for more 29 times (30 times total).

Made this project? Share your version »

Comments

Square 2019 12 15 221051 img 0513%2b2

More Projects