About

Cost
$ $ $ $ $
Difficulty
• • • • •
Time
18h00

Klè Shawlette
Klè Shawlette is worked bottom-up in one piece. Klè starts with some fun small bobbles in a lace border and finishes with a fun picot bind off! The shawl shaping is made with short rows and decreases (there’s no “wrap and turns”!).
Sock and sport weight yarns will also work well for this fast-to-knit project!

Posted by Paula PKL from São Paulo, State of São Paulo, Brazil • Published See Paula PKL's 7 projects »
Downloads
  • 111624_2F2015-10-21-000757-Klhawlette_english_rev.pdf 265 KB [ Download ]
PrintEmbed
  • Step 1

    With bigger needles and using long tail cast on method, CO 201 sts.
    Set up row: *p5, MB, p4, repeat from * to last 11 sts, p5, MB, p5.
    *** MB (make a bobble) = (p1, k1, p1) on the same st, turn work and purl those 3 sts, turn work
    and, one at the time, pass second and third sts over first st.
    Change for smaller needles (gauge size).

  • Step 2

    Chart written instructions
    Row 1 (RS): p1, *yo, k3, cdd, k3, yo, p1, repeat from * to end
    Row 2 (WS): *k1, p9, repeat from * to last st, k1
    Row 3: p1, *k1, yo, k2, cdd, k2, yo, k1, p1, repeat from * to end
    Row 4: *k1, p9, repeat from * to last st, k1
    Row 5: p1,* k2, yo, k1, cdd, k1, yo, k2, p1, repeat from * to end
    Row 6: *k1, p9, repeat from * to last st, k1
    Row 7: p1,* k3, yo, cdd, yo, k3, p1 repeat from * to end
    Row 8: *k1, p9, repeat from * to last st, k1
    Row 9: p1, *k3, yo, cdd, yo, k3, p1, repeat from * to end
    Row 10: *k1, p9, repeat from * to last st, k1
    Repeat Rows 1 to 7 from the chart.
    Row 18: k all sts
    Row 19: *k2tog, yo, repeat from * to last st, k1
    Row 20: k all sts

  • Step 3

    Short Rows Shaping
    Row 21: k108 and turn (***not wrap and turn – just turn!)
    Row 22: p15, turn
    Row 23: k until 1 st before turning point, ssk, k2, turn
    Row 24: p until 1 st before turning point, p2tog, p2, turn
    Repeat Rows 23 and 24 until all sts have been worked.
    You will have 136 sts on the needle.
    Purl all sts from the next 3 Rows

  • Step 4

    Picot BO
    Bind off 2 stitches.
    *Transfer the remaining st from the right-hand needles to the left-hand needles and cast on 3
    stitches using the Knitted Cast On method.
    Bind off 5 stitches (the 3 recently CO, 1 that was transferred between needles and 1 from left
    needle).
    Bind off 4 stitches **
    Repeat from * to ** until last 2 sts (one at each needle).
    Transfer the remaining st from the right-hand needles to the left-hand needles and cast on 3
    stitches using the Knitted Cast On method.
    Bind off 5 stitches (the 3 recently CO, 1 that was transferred between needles and 1 from left
    needle).
    Finishing: weave all ends.
    Blocking: Using the suitable method for your yarn, block the piece according with indicated
    measurements.

Made this project? Share your version »

Comments

Square 2019 12 15 221051 img 0513%2b2

More Projects