Sheep Pillow

Pillow talk

Posted by hennie

About

Knitted in chunky wool.
You need to register (Free) then search for WOOLY LAMB (make sure only one "l")
If link still doesn't work. then instructions are here.
THIS IS A GREAT SITE, for all crafting ideas.

Share

You Will Need (3 things)

  • 1 skein charcoal Yarn 2 wheat. CHUNKY WEIGHT
  • 9 mm size 13 Knitting Needles
  • Pillow Stuffing

Steps (7 steps, 240 minutes)

  1. 1

  2. 2

    With Main colour cast on 16sts.
    Row1: Knit
    Row2: K,inc 1 in every st (32sts)
    Row3:Knit
    Row4: *K1, inc1 rep from* across (48sts)
    Work even in garter st until piece measures 14inches from beg

  3. 3

    SHAPE END
    Row 1. *k1,k2tog rep from * across (32sts)
    Row 2.Knit
    Row3: k2tog,across (16sts)
    CAST OFF

    Fold body with cast off edge at back and selvages at bottom
    Sew seams, leaving a gap for stuffing.
    Stuff and sew seam.

  4. 4

    TAIL

    cast on 6sts in main
    ROW1 Knit
    Row 2 k,inc 1 in every st (12sts)
    ROW 3-7 KNIT
    ROW 8 K2tog across sts (6sts)
    Cut yarn leaving a long end, thread onto tapestry needle,run through sts and pull tightly. Sew seam, stuff lighlty, close seam. Sew in place.

  5. 5

    EAR MAKE 2
    with main cast on 4 sts (Garter st)
    Row 1 KNIT
    ROW2: K,inc 1 in every st (8)
    ROW 3-8 KNIT
    ROW 9 K2tog (4)
    Finish as for tail but do not stuff. Set aside

  6. 6

    FACE
    WITH CHARCOAL
    Cast on 30sst
    ROW1-4 Work ven in st st.
    ROW5 *K3,k2tog rep from * across (24sts)
    ROW6 and 8 Purl
    ROW7 *K2,k2tog rep from *across (18sts)
    ROW9 *K1,k2tog rep from* across (12sst)
    ROW10 P2tog across (6sts)

    Finish as for tail, stuff.
    Sew cast on edge to body, embroider face details, sew ears in place

  7. 7

    LEGS MAKE 4
    wITH CHARCOAL cast on 15
    ROW 1-12 work even in St st.
    ROW 13:(k3,k2tog) three times (12sts)
    ROW14: Purl
    ROW15: K2tog across (6sts)
    FInsih as for tail, stuff. Sew open end to body.