https://www.cutoutandkeep.net/projects/scrap-bag-3 • Posted by northernstar
I cast on around 60 stitches and just knit until I ran out of all my odd balls of wool. Then knit a strap, seemed up the sides and stitched on the strap. Then I measured out how much fabric I needed for the lining and strap lining. I stitched up the lining with my machine and then hand stitched it in place. I machine sewed the strap lining in place. Thats it :) I knit it over 2 weeks in the evenings, so I'm not sure exactly how long it took.
I cast on around 60 stitches and just knit until I ran out of all my odd balls of wool. Then knit a strap, seemed up the sides and stitched on the strap. Then I measured out how much fabric I needed for the lining and strap lining. I stitched up the lining with my machine and then hand stitched it in place. I machine sewed the strap lining in place. Thats it :) I knit it over 2 weeks in the evenings, so I'm not sure exactly how long it took.