https://www.cutoutandkeep.net/projects/knitted-ruff • Posted by Allison K.
I have been working on this on and off for a while... just finished!!! Hooray! Thought I would share.
I have been working on this on and off for a while... just finished!!! Hooray! Thought I would share.
cast on 18 stitches.
Knit 2, yo, slip 1 stitch, yo, slip the slipped stitch back to the original needle... make sense?? turn work around and Knit 2 so that all stitches are back on one needle.
Knit 4, yo, slip 1 stitch, yo, slip the slipped stitch back to the original needle. Turn work around and knit 4.
Knit 6, yo, slip 1 stitch, yo, slip the slipped stitch back to the original needle. Turn work around and Knit 6.
Knit 1 row.
Repeat steps 2-5 until piece measures about 15 inches, ending with step 4.
Knit 8, K2tog, yo, Knit 8.
Repeat steps 2-5 until piece measures 16 inches. Bind off. Weave in ends.
Sew a button about 1 inch from the end of the ruff without the buttonhole. Wash the ruff, lay flat to dry, fluff ruffles, put it on, have a party!